Monthly Archives: August 2013

water will out

After nearly three months of construction, some of the wood supply finally came down with a case of the moldies. We realized that we had been both careful and cavalier about the problematic meeting and mixing of wood and water. … Continue reading

Posted in Uncategorized | 1 Comment

Oak Floor Installation

Inspired by how-to videos about installing oak flooring, we cut this little video to showcase our method.   

Posted in Uncategorized | Leave a comment

Trim and Pipe

What have we been up to? Trimming up the outside, adding (and finishing) hardwood floors, storm doors, plumbing, & cabinets . . . we even have a toilet. No water yet, but we’re dangerously close.    

Posted in Uncategorized | Leave a comment